πŸ›

NARI Member

National Assoc. of the Remodeling Industry

⭐

Best of Houzz

Service Award 2023 & 2024

✦

AWI Certified

Architectural Woodwork Institute

β—ˆ

OSHA 30

Construction Safety Certified

β—†

ICC Compliant

International Code Council

0
0
0+

Three figures. No adjectives. Every number earned on a job site.

Other contractors, in their own words, on their hardest jobs.

01

Daniel Hartwell β€” Hartwell & Sons General Contracting

Brooklyn, NY

A 1920s Park Slope brownstone with no straight walls and a client who wanted a curved open-riser stair connecting three floors. The original stair box was 47 inches wide at one end and 44 at the other. Every subcontractor we called walked after the site visit.

Tread's crew spent a full day templating the space with a 3D laser scanner before touching a drawing. Shop drawings came back in ten days β€” three revisions over two weeks as we resolved the landing geometry with the architect. The build ran six weeks in their shop, then a four-day installation. They found a clearance conflict with the HVAC rough-in on day two and resolved it on-site without a change order.

6 weeks

Build time

3

Revisions

0

Change orders

"My client cried when she walked up it for the first time. That's not something I've said about a subcontractor before. They built what was drawn, and what was drawn was exactly what we needed."

β€” Daniel Hartwell, Principal β€” Hartwell & Sons GC

Curved white oak stair in brownstone with sawdust on treads and a level resting against the newel post during installation

Park Slope, Brooklyn β€” Day 3 of installation. White oak treads, forged steel stringers.

Every flight starts with your drawings on our bench.

Send Us Your Drawings
02

Priya Nambiar β€” Studio Nambiar Architecture

Chicago, IL

A 22-room boutique hotel in the West Loop needed a code-compliant egress stair that read as a feature element, not a fire exit. The floor plate was irregular, the owner wanted floating treads, and the budget had a hard ceiling. ICC occupancy load calculations added a handrail geometry constraint that ruled out two of our initial concepts.

Tread produced a custom steel mono-stringer with cantilevered white oak treads β€” a solution that hit the egress width requirement without the visual weight of a traditional frame. They attended the code review meeting with our structural engineer, came with their own calculations, and left with an approval stamp. Fabrication ran eight weeks concurrent with our rough-in schedule.

8 weeks

Fabrication

1 meeting

Code approvals

White oak

Tread species

"Every hotel project has a moment where the owner walks the space and decides whether the design firm understood the brief. They walked up that stair and said 'this is the lobby.' That's Tread's work as much as ours."

β€” Priya Nambiar, AIA β€” Studio Nambiar Architecture

Steel mono-stringer staircase in hotel lobby with cantilevered oak treads and natural light from skylight above

West Loop, Chicago β€” Egress stair, boutique hotel. Mono-stringer steel, white oak cantilever treads.

03

Marcus Webb β€” Webb Development Group

New York, NY

A 14,000 sq ft Tribeca loft conversion with four interconnected levels, two scissor stairs required by the DOB, and a penthouse feature stair the architect specified as a centerpiece. The scissor configuration had never been built in this building type under current NYC code β€” the DOB reviewer flagged it twice. The feature stair required a 28-foot continuous steel stringer with no intermediate support.

Tread's principal flew to Albany for the variance meeting. They modeled the scissor geometry in full 3D and produced a 47-page submission package that the DOB reviewer described as the most complete they had seen for a residential conversion. The 28-foot stringer was fabricated in three sections, stress-tested at their shop, and field-welded over a single weekend to avoid disrupting the concrete floor pour scheduled Monday. Total project span: eleven months from first site visit to final inspection.

11 months

Project span

28 ft

Stringer length

Approved

DOB variance

"I've been developing in this city for twenty-two years. I've never had a fabricator show up to a DOB meeting. I've never had one produce a variance package. I've never had one tell me they'll work the weekend to protect my pour schedule. Tread does all three. They're not a subcontractor β€” they're a partner."

β€” Marcus Webb, Managing Principal β€” Webb Development Group

28-foot continuous steel stringer staircase in Tribeca loft with exposed concrete walls and industrial skylights

Tribeca, New York β€” 28-ft continuous stringer. Field-welded over one weekend. DOB variance approved.

Send us your drawings. We’ll tell you what’s possible.

Every engagement starts with your plans on our bench and someone who built stairs answering your questions β€” not a sales rep.

Drop your drawings here

PDF, DWG, DXF, or images β€” up to 50 MB

We respond within one business day.

Download Our Contractor Spec Sheet

Trade pricing, standard lead times, material options, and tolerances in a format you can attach directly to a bid package.

Trade pricing tiers by material

Standard lead times: 4–8 weeks

Tread species, steel profiles, finish options

Code compliance reference (IBC, IRC)